Electrical
Safe power, from the incoming supply to the last light point
HT and LT power distribution, panels, cabling, lighting, earthing and lightning protection, ready for CEIG inspection.

Overview
We design and install electrical systems that are safe to operate, simple to maintain and ready for inspection. Panels are laid out so circuits can be isolated without shutting down the whole building, cable routes are planned for future additions, and every circuit is tested and documented. We prepare the drawings and test reports needed for Electrical Inspectorate approval.
Scope of work
- HT and LT panels, transformers and compact substations
- DG sets, UPS and changeover systems
- Power and control cabling, trays and bus ducts
- Internal, external and emergency lighting
- Earthing and lightning protection
- Solar PV integration
- Power factor correction and load studies
- Documentation for CEIG approval and the power supply connection
At a glance
- Typical buildings
- Commercial buildings, factories, warehouses, hospitals and apartment blocks
- What you receive
- Single-line diagrams, load and cable schedules, insulation resistance and earth test reports, and as-built drawings
- Standards we follow
- CEA (Measures relating to Safety and Electric Supply) Regulations, IS 732, IS 3043, NBC 2016